BP130010 - 2020 Labieux Road (Public Works)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP130010 - 2020 Labieux Road (Public Works) | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2020 Labieux Road (Public Works) |
| Type of Application: | Locate Permit |
| File Number: | BP130010 |
| Date Application Submitted: | April 11, 2024 |
| Application Description: | For the placement of a 67m2 "office trailer" for additional group D work space, existing washroom facilities available in adjacent building. |
| Application Status: | COMPLETED |
| Permit Value: | $30,000.00 |
| Building Area: |
67.00 M2 721.18 ft2 |
| Issued Date: | June 10, 2024 |
| File Close Date: | September 10, 2024 |
| Expiry Date: | June 10, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2020 LABIEUX ROAD | , , CS2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
EXCAVATION
Excavation of soil, prior to placing forms. |
PARTIAL |
|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PASSED |
|
FINAL
Final approval as per requirements on plans |
FAILED |
|
FINAL
Final approval as per requirements on plans |
PASSED
2024-09-10 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)