Application Description: |
(Nissan) New construction of a Part 3, 2 storey building. Building Classifications, Group D 3.2.2.63, Group E 3.2.2.69, Group F2 3.2.2.79 and Group F3 3.2.2.88, Building Area 1534.07 m2. Sprinklered with Fire Alarm. Non-combustible construction. 45 min FS FRR required for all floors, exit stairs, service spaces, loadbearing walls and columns. 2 hr FS /FRR between the repair garage and the remainder of the building as per BCBC 3.3.5.5. 1.5 hr FS/FRR between basement parking garage and other occupancies. Total GFA = 3564.86 m2. REVISION 2025-AUG-11: Change of Electrical Engineer and Civil Engineer of Record. |
Application Status: | ACTIVE |
Permit Value: | $7,136,680.00 |
Builder: | ISLAND WEST COAST DEVELOPMENTS LTD |
Issued Date: | June 27, 2025 |
Expiry Date: | June 27, 2027 |
Associated Properties
Address | Zone | More |
---|---|---|
3612 ISLAND HIGHWAY N | COR2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.