BP129965 - 3400 Departure Bay Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129965 - 3400 Departure Bay Road | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 3400 Departure Bay Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129965 |
Date Application Submitted: | May 01, 2024 |
Application Description: |
Interior and exterior alteration and horizontal addition to an existing 2-storey single family dwelling with authorized secondary suite on the 1st storey. Scope of work includes: A horizontal addition for a partial unconditioned enclosure under deck, enlargement of a bedroom within the secondary suite and the removal of a chimney to convert to new floor area. Reduction of rear yard setback from 7.5m to 1.82m, as per approved variance (See DVP00451). 2025-MAY-01- REVISION: Added a footing under the wall located at the lower front entry. changed orientation of studs within braced wall panels. |
Application Status: | ACTIVE |
Permit Value: | $97,153.01 |
Issued Date: | July 17, 2024 |
Expiry Date: | July 17, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
3400 DEPARTURE BAY ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.