BP129907 - 773 Hunter Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP129907 - 773 Hunter Street
Neighbourhood: Townsite    
Street Address: 773 Hunter Street
Type of Application: Single / Two Family Alteration
File Number: BP129907
Date Application Submitted: March 28, 2024
Application Description: Addition of unconditioned storage room and new deck at rear of house.

2024-JUL-24 REVISION: Add Geotechnical Engineer

2024-SEP-12 REVISION: Add 3 peice bathroom, laundry with sink, add hatch to deck through framing.
Application Status: COMPLETED
Permit Value: $80,000.00
Building Area: 21.58 M2
232.28 ft2
Builder: BUCK ROBERSTON CONTRACTING
Issued Date: May 27, 2024
File Close Date: March 18, 2025
Expiry Date: May 27, 2026

Associated Properties

Address Zone More
773 HUNTER STREET R5 Property Report

Process Steps

Task Status
EXCAVATION

Excavation of soil, prior to placing forms.

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2025-03-18

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.