BP129844 - 213 Rockmount Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP129844 - 213 Rockmount Place | |
|---|---|
| Neighbourhood: | Hammond Bay |
| Street Address: | 213 Rockmount Place |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP129844 |
| Date Application Submitted: | February 28, 2024 |
| Application Description: |
Exterior alteration to an existing 2-storey single-family dwelling building for the partial (2'-0" +/-) deck extension at the front second storey deck and revision to existing front windows. Scope of work includes new joists, beams / posts, guards to complete the deck extension and the removal of existing windows to accommodate a new 12'-0" slider and the existing arched window to be revised from one window to two. 2024-JUN-05 REVISION: Structural Engineer added for upper wall framing at new slider. 2024-JUL-03: REVISION: Architectural Schedule B added for frame-less glass guards. |
| Application Status: | COMPLETED |
| Permit Value: | $70,000.00 |
| Builder: | TRUE TIMBER CONSTRUCTION LTD |
| Issued Date: | April 17, 2024 |
| File Close Date: | February 14, 2025 |
| Expiry Date: | April 17, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 213 ROCKMOUNT PLACE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2025-02-14 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)