BP129634 - 103 -1050 Terminal Avenue North-(Vapour Vault Vape Shop)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129634 - 103 -1050 Terminal Avenue North-(Vapour Vault Vape Shop) | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 103 -1050 Terminal Avenue North-(Vapour Vault Vape Shop) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP129634 |
Date Application Submitted: | October 18, 2023 |
Application Description: |
Create New CRU within existing bldg area: Unit #103 (Vapour Vault Vape Shop) Group E occupancy (Mercantile/ Retail) Unit Area 11.98m², with shared vestibule (3.94m²) for access to the existing accessible unisex washroom, cut & cap water supply lines and DWV piping for 4 washing machine fixtures. Relocate 2 sprinkler heads and add 1 new sprinkler head to existing NFPA 13 sprinkler system and add new pull station for the fire alarm.. 45 min FRR F/S required between suites. Existing Building 2006 BCBC Part 9, 3 storey Bldg, non combustible construction, sprinklered with fire alarm system. Upper floor Group C Occupancies (4 Residential dwellings) 423.44m² Main floor Group D/E Occupancies (3 CRU's) 511.30m² Lower floor Group F3 Occupancy (parking garage) 96m² All floors Total GFA 934.74m² |
Application Status: | COMPLETED |
Permit Value: | $7,500.00 |
Issued Date: | January 11, 2024 |
File Close Date: | June 24, 2024 |
Expiry Date: | January 11, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
1050 TERMINAL AVENUE N | COR2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-06-24 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.