Application Description: |
(RDN Office) Commercial Alteration: Interior office layout alterations in 3 locations. Area #1 - Lower/main floor: install partition wall systems 48.3m2. Area #2 - Upper/2nd floor: Remove interior partition walls/create open office 236.9m2. Area #3 - Upper/2nd floor: Create Asset Manager office 9,3m2. Sprinkler alterations in Area 1 & 2, relocate, delete and add heads for new layouts. Administration Bldg. Part 3, sprinklered , fire alarm, accessible, Group A-2 & D, 2 storey building. Building classification 2006 BCBC 3.2.2.26 & 3.2.2.54. New Building Area (BCBC) = 1221.6m2. GFA = 2309m2 Combustible construction, 45min FRR/FS floor assemblies and loadbearing supports. Interconnected floor space between upper and lower floor meets 3.2.8.2.(6). 2024-JUN-12 REVISION: Add structural beam and footings to office 110 and various layout changes. 2024-JUL-19 REVISION: Add Fire Suppression Engineer. |
Application Status: | COMPLETED |
Permit Value: | $350,000.00 |
Issued Date: | December 14, 2023 |
File Close Date: | August 01, 2024 |
Expiry Date: | December 14, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
6300 HAMMOND BAY ROAD | Property Report | |
6300 HAMMOND BAY ROAD | CS1 , CS2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-08-01 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.