BP129565 - 3294 Crystal Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129565 - 3294 Crystal Place | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 3294 Crystal Place |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129565 |
Date Application Submitted: | October 03, 2023 |
Application Description: |
Addition of one bedroom and to construct legal secondary suite 2025-JUN-13 REVISION: Change location of kitchen and Great room, change layout of bathroom adding laundry and hot water tank, change slope of the roof. 2024-AUG-29: REVISION: Redesign of two-storey addition, including increase in building area to add a 3rd bedroom to the secondary suite. |
Application Status: | ACTIVE |
Permit Value: | $182,208.39 |
Building Area: |
260.87 M2 2,807.98 ft2 |
Issued Date: | February 02, 2024 |
Expiry Date: | February 02, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
3294 CRYSTAL PLACE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.