BP129561 - 1900 Labieux Road (2020 Labieux Road - Parent) Fire Station #2
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP129561 - 1900 Labieux Road (2020 Labieux Road - Parent) Fire Station #2 | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 1900 Labieux Road (2020 Labieux Road - Parent) Fire Station #2 |
| Type of Application: | Locate Permit |
| File Number: | BP129561 |
| Date Application Submitted: | September 19, 2023 |
| Application Description: |
(Fire Station #2) Installation of a sprung structure(fabric covered) stand alone bldg, mounted on structural engineered slab for use as Group F2 apparatus storage bay, 139.4 m². Building designed to be post disaster capability. non-combustible construction, sprinklered, heated conditioned space. Additional plumbing includes installation of 1 hose bib and floor drain. |
| Application Status: | COMPLETED |
| Permit Value: | $478,381.00 |
| Building Area: |
139.40 M2 1,500.49 ft2 |
| Builder: | COPCAN CIVIL LP |
| Issued Date: | February 12, 2024 |
| File Close Date: | July 11, 2024 |
| Expiry Date: | February 12, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2020 LABIEUX ROAD | , , CS2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concete. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concete. |
PASSED |
|
STORM CONNECTION
Pipe connection must be visible for inspection. |
PARTIAL |
|
STORM CONNECTION
Pipe connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
INSULATION
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
CANCELLED |
| ROUGH IN SPRINKLER | PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL
Final approval as per requirements on plans |
CANCELLED |
|
FINAL
Final approval as per requirements on plans |
CANCELLED |
|
FINAL
Final approval as per requirements on plans |
FAILED |
|
FINAL
Final approval as per requirements on plans |
PASSED
2024-07-11 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)