BP129524 - 115-50 Tenth Street (Bosley's Pet Store)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP129524 - 115-50 Tenth Street (Bosley's Pet Store) | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 115-50 Tenth Street (Bosley's Pet Store) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP129524 |
| Date Application Submitted: | August 31, 2023 |
| Application Description: |
Combine Units # 114A & 115 into one 400m2 .CRU- (Bosley's Pet Store) Interior alterations to shell 3.3.3.68 Group E(Retail space). New accessible washroom, mop sink, clothes washer, HWT and two dog-wash stations. Existing building is divided by two firewalls into three buildings. All buildings are combustible construction with fire alarm system. 1st building (East End): Pharmacy Group E/A2, BCBC 2006 3.2.2.27/3.2.2.62, 1489 m2, sprinklered. 2nd building (Centre): Group E/A2 , BCBC 2018 3.2.2.68/3.2.2.28, 794 m2, unsprinklered. 3rd building (West End): Group D/E, BCBC 2012 3.2.2.61/3.2.2.67, 1379m2, sprinklered. |
| Application Status: | COMPLETED |
| Permit Value: | $350,000.00 |
| Issued Date: | September 26, 2023 |
| File Close Date: | December 27, 2023 |
| Expiry Date: | September 26, 2025 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 50 TENTH STREET | CC3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
CANCELLED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2023-12-27 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)