BP129520 - 420 Albert Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP129520 - 420 Albert Street | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 420 Albert Street |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP129520 |
| Date Application Submitted: | November 30, 2023 |
| Application Description: |
Change of use from 1 Storey Group D office building to 23 unit Part 9 Group C (residential micro units). Building area: 538.2 m2. Scope of work includes: Seismic upgrade, install sprinkler system, connection to new 4" fire/domestic water service, fire alarm system and full mechanical system. Removal of 10 plumbing fixtures and installation of 115 new fixtures. Key FRR/FS are: 1 Hr/51 STC between units and between units and corridor. Total GFA 636.19 m2. Existing Building Classification: Part 9, one storey Group D(Office Bldg), 538.2m2. combustible construction, unsprinklered, no fire alarm. 2024-MAY-23 REVISION: Add Electrical Engineer for design changes and field review, relocate water entry room to lobby area, increase size for basement electrical room. 2024-AUG-12:REVISION: Delete oil furnace room, create sprinkler/water service room, revise RWL piping. |
| Application Status: | COMPLETED |
| Permit Value: | $847,028.00 |
| Issued Date: | February 08, 2024 |
| File Close Date: | August 23, 2024 |
| Expiry Date: | February 08, 2026 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 420 ALBERT STREET | DT7 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
APPROVED |
|
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
| OCCUPANCY | FAILED |
| OCCUPANCY |
PASSED
2024-08-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)