BP129518 - 113-50 Tenth Street (Connect Hearing)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP129518 - 113-50 Tenth Street (Connect Hearing)
Neighbourhood: Harewood    
Street Address: 113-50 Tenth Street (Connect Hearing)
Type of Application: Leasehold Improvements
File Number: BP129518
Date Application Submitted: August 29, 2023
Application Description: Tenant Improvements:(Connect Hearing) 3.2.2.61. Group D (personal services), located in Building 3, Construct interior partition walls, Relocate 6 sprinkler heads and add 6 new sprinkler heads to existing NFPA 13 sprinkler system, install wash basin and toilet to finish existing accessible bathroom rough in and add two new sinks, Unit Area is 113.64m².

Existing building is divided by two firewalls into three buildings. All buildings are combustible construction with fire alarm system.
1st building (East End): Pharmacy Group E/A2, BCBC 2006 3.2.2.27/3.2.2.62, 1489 m², sprinklered.
2nd building (Centre): Group E/A2 , BCBC 2018 3.2.2.68/3.2.2.28, 794 m², unsprinklered.
3rd building (West End): Group D/E, BCBC 2012 3.2.2.61/3.2.2.67, 1379m², sprinklered.
Application Status: COMPLETED
Permit Value: $200,000.00
Builder: TERRY MCCARTAN CONTRACTING
Issued Date: January 09, 2024
File Close Date: March 05, 2024
Expiry Date: January 09, 2026

Associated Properties

Address Zone More
50 TENTH STREET CC3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
PLUMBING FINAL

All fixtures must be in place.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
FINAL

Final Approval as per requirements on plans.

FAILED
FINAL

Final Approval as per requirements on plans.

PASSED

2024-03-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.