BP129472 - 3313 Edgewood Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP129472 - 3313 Edgewood Drive | |
|---|---|
| Neighbourhood: | Linley Valley |
| Street Address: | 3313 Edgewood Drive |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP129472 |
| Date Application Submitted: | August 01, 2023 |
| Application Description: |
Reconstruct rear deck, replace deck footings and replace rear crawlspace wall framing. "Stop Work Order" posted, double permit fees charged as per Section 30.7 of the Building Bylaw 7224. |
| Application Status: | COMPLETED |
| Permit Value: | $54,050.00 |
| Builder: | SAYWELL CONTRACTING LTD |
| Issued Date: | September 13, 2023 |
| File Close Date: | December 19, 2023 |
| Expiry Date: | September 13, 2025 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3313 EDGEWOOD DRIVE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2023-12-19 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)