BP129423 - 205-2000 N Island Highway (Vince Nails Spa Limited)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP129423 - 205-2000 N Island Highway (Vince Nails Spa Limited) | |
|---|---|
| Neighbourhood: | Departure Bay |
| Street Address: | 205-2000 N Island Highway (Vince Nails Spa Limited) |
| Type of Application: | Leasehold Improvements |
| File Number: | BP129423 |
| Date Application Submitted: | August 24, 2023 |
| Application Description: |
Tenant Improvement, Unit 205 (Vince Nails Spa Limited), Group D, 115.6m2. Convert from existing hair salon to new nail salon. 2-hr FRR/FS firewall on wall adjacent to Suite 203 and 1 hour FRR/FS for all other suite separations. Addition of 0-hr FRR/FS janitorial storage room, 2 new sprinkler heads, universal washroom. Maximum occupancy 20 persons based on 2018 BCBC 3.7. requirements. Brooks Landing - 12,981m2, Group E building, sprinklered, combustible construction, fire alarm, BCBC 2018 - 3.2.2.67, subdivided into 3 separate buildings with two 2-hr firewalls with fast response sprinklers in suites adjacent to firewalls by 1996 equivalency (BP046573, modified in BP125557). Equivalency requires 1-hr FRR/FS between D/E and A2/D occupancies, and 2-hr FRR/FS between A2/E occupancies. |
| Application Status: | COMPLETED |
| Permit Value: | $75,000.00 |
| Builder: | TCC & DESIGNS |
| Issued Date: | November 07, 2023 |
| File Close Date: | February 13, 2024 |
| Expiry Date: | November 07, 2025 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2000 ISLAND HIGHWAY N | CD8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
PASSED
2024-02-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)