BP129265 - 102 - 5170 Dunster Road (Thrive Family Health)
Neighbourhood: Pleasant Valley    
Street Address: 102 - 5170 Dunster Road (Thrive Family Health)
Type of Application: Leasehold Improvements
File Number: BP129265
Date Application Submitted: May 16, 2023
Application Description: Group D (Thrive Family Health), 183.9 m2. 1 hour demising wall between SL# 103 & SL #102. Washroom/sinks added. Sprinkler changes to accommodate new rooms, emergency lighting required. 2 hr FRR/FS floor/ceiling assembly existing. Pot lights and bathroom fan not permitted to penetrate 2 hr FRR/FS.

Building Classification - Part 9, Building area = 483.6m2, 3-storey, sprinklered/fire alarm, combustible construction, non combustible plumbing, 1st floor, Group E/D = 483.6 m2., 2nd storey, Group C = 455m2, 3rd Storey, Group C = 287m2. The dwelling units are served by a non-combustible exterior exit passageway (on the 2nd storey with exits at each end with a 45min FRR minimum because of deck occupancy provided for the deck

Aug 2/23 - Revision: change to mech drawing M-1, structural design adjusted (beam upsized)
Sept 18/23 - Revision: proposed walls next to universal washroom deleted, revised sprinkler drawings
Application Status: COMPLETED
Permit Value: $190,000.00
Builder: THEORY CONSTRUCTION LTD
Issued Date: June 19, 2023
File Close Date: October 27, 2023
Expiry Date: June 19, 2025

Associated Properties

Address Zone More
102   5170 DUNSTER ROAD CC1 Property Report
5170 DUNSTER ROAD CC1 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
PLUMBING FINAL

All fixtures must be in place.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
FINAL

Final Approval as per requirements on plans.

FAILED
FINAL

Final Approval as per requirements on plans.

PASSED

2023-10-27

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.