BP129242 - 102-525 Third Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP129242 - 102-525 Third Street
Neighbourhood: University District    
Street Address: 102-525 Third Street
Type of Application: Commercial / Multi-Res Alteration
File Number: BP129242
Date Application Submitted: May 10, 2023
Application Description: (Nail Salon) Unit #102 - "Change of Use" of CRU from (shell) Group E to Group D, Unit area 118.67m2. Improvements include creating 1 accessible and 1 universal washrooms, 4 sinks, 1 clothes washer and 6 pedicure chairs. 4 new and relocate 10 sprinkler heads.

2018 BCBC: 22 Strata unit residential apartment building with 5 commercial rental units on main floor and basement level. 794 m2, 4 storey, Group C 3.2.2.51, Group E 3.2.2.65, Group F3 3.2.2.84, Group D 3.2.2.59, Total area of all floors, including parking garage is 3634.4 m2. Sprinklered, Fire Alarm system, combustible and/or noncombustible construction. 1 hr. FS/F.R.R. is required between suites, suites and corridors/stairwells/elevator shaft and 1 hr. F.R.R. for floor assemblies, load-bearing walls and columns. Parking Garage is required to be separated from the remainder of the building by a 1.5 hrs. FS/F.R.R.
Application Status: COMPLETED
Permit Value: $200,000.00
Builder: MAHAL HOLDINGS LTD
Issued Date: June 13, 2023
File Close Date: November 10, 2023
Expiry Date: June 13, 2025

Associated Properties

Address Zone More
102   525 THIRD STREET COR2 Property Report
525 THIRD STREET COR2 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

PASSED
OCCUPANCY PASSED

2023-11-10

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.