BP129087 - 113 & 114 - 50 Tenth Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129087 - 113 & 114 - 50 Tenth Street | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 113 & 114 - 50 Tenth Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP129087 |
Date Application Submitted: | March 20, 2023 |
Application Description: |
Commercial Alteration: Landlord shell work to demise existing Unit 113 into two new units. Unit 113 to Group D shell and Unit 114 to Group E shell. 1-hr FRR/FS between units. Create new 2 pc accessible washroom in unit #113 c/w new HWT. Sprinkler alterations new & relocated heads. New Unit 113: 118.6 m2, Group D shell, located in Building 3. New Unit 114: 105.8 m2, Group E shell, located in Building 3. Existing building is divided by two firewalls into three buildings. All buildings are combustible construction: 1st building (East End): Pharmacy Group E/A2, BCBC 2006 3.2.2.27/3.2.2.62, 1489 m2, sprinklered with fire alarm. 2nd building (Centre): Group E/A2 , BCBC 2006 3.2.2.61/3.2.2.28, 794 m2, unsprinklered. 3rd building (West End): Group D/E, BCBC 2012 3.2.2.61/3.2.2.67, 1379m2, sprinklered with fire alarm. 2023-SEP-22 REVISION: Relocate washroom and electrical panel and additional sprinkler and bathfan. |
Application Status: | COMPLETED |
Permit Value: | $70,000.00 |
Issued Date: | September 05, 2023 |
File Close Date: | December 14, 2023 |
Expiry Date: | September 05, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
50 TENTH STREET | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-12-14 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.