BP128999 - 40-1925 Bowen Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128999 - 40-1925 Bowen Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 40-1925 Bowen Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128999 |
Date Application Submitted: | January 23, 2023 |
Application Description: |
Alteration, Group D occupancy, combine units 40 & 41 to create 1 space, 301.0 m2. Work includes removing partition walls and 2 washrooms, adding partition walls to create offices/lunch room, adding universal washroom and sinks Existing Building 3.2.2.62., 683.67 m2, combustible or non-combustible construction, non-sprinklered Dec 20/23 - sump pump for sanitary/storm eliminated, now directly connected Dec 21/23 - wall assemblies changed, janitor & consultant room # 8 locations changed |
Application Status: | COMPLETED |
Permit Value: | $325,000.00 |
Issued Date: | March 28, 2023 |
File Close Date: | April 12, 2024 |
Expiry Date: | March 28, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
1925 BOWEN ROAD | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-04-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.