BP128990 - 101, 102, 201, 301-10 Church Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128990 - 101, 102, 201, 301-10 Church Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 101, 102, 201, 301-10 Church Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128990 |
Date Application Submitted: | January 19, 2023 |
Application Description: |
Creating four separate tenant spaces (101, 102, 201, 301), " Change of Use" for Unit 102 from Group D to Low A2. Building reclassified to BCBC-2018 - 3.2.2.61 Group D/ (Unit 102 as Low A2) up to 3 storeys combustible, sprinklered, fire alarm system. From BP122087 Building classified (BCBC2012) as 3.2.2.59 Group D up to 3 storeys, sprinklered, fire alarm system. All floors are accessible via an elevator, each floor has 2 means of egress. 45 min FRR for exits. 2HR FRR exterior perimeter walls. Alternative solution report for Elevator in exit stair enclosure, Glazing in Fire Separation, and Protection of Openings at Property Line. 2023-JUL-06 REVISION: Change unit 102 to Low A2, add servery space to 102, create 2 meeting rooms in and add kitchenette to unit 201, create accessible washroom in unit 201. Add Electrical Engineer Schedule B. |
Application Status: | COMPLETED |
Permit Value: | $8,000.00 |
Builder: | RW (BOB) WALL LTD |
Issued Date: | January 27, 2023 |
File Close Date: | August 31, 2023 |
Expiry Date: | January 27, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
10 CHURCH STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-08-31 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.