BP128946 - 602 Haliburton Street (Tillicum Lelum Aboriginal Society)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128946 - 602 Haliburton Street (Tillicum Lelum Aboriginal Society) | |
---|---|
Neighbourhood: | South End |
Street Address: | 602 Haliburton Street (Tillicum Lelum Aboriginal Society) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128946 |
Date Application Submitted: | December 22, 2022 |
Application Description: |
Renovation to 148.94m2 of lower floor office area including capping of 9 plumbing fixtures, installing 5 new plumbing fixtures including an accessible washroom, relocating all sprinkler heads, installing exit and emergency lighting. Existing Building: 1992 BCBC Group A2/Group D Occupancy 3.2.2.27/ 3.2.2.56 sprinklered building of combustible construction with existing 45 min FRR/FS floor assembly. REVISION 2023-JUN-07: Add Structural Engineer Schedule B, revise two floor beams and change mop-sink location. REVISION: 2023-SEP-05: Remove sprinkler head. |
Application Status: | COMPLETED |
Permit Value: | $400,000.00 |
Builder: | SAYWELL CONTRACTING LTD |
Issued Date: | January 31, 2023 |
File Close Date: | September 07, 2023 |
Expiry Date: | January 31, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
602 HALIBURTON STREET | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
COMPLETED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-09-07 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.