BP128909 - 102-5190 Dublin Way (dHKarchitects office)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP128909 - 102-5190 Dublin Way (dHKarchitects office)
Neighbourhood: Pleasant Valley    
Street Address: 102-5190 Dublin Way (dHKarchitects office)
Type of Application: Commercial / Multi-Res Alteration
File Number: BP128909
Date Application Submitted: January 13, 2023
Application Description: Alteration to combine Unit 102 (85.34 m2) and Unit 203 (94.4 m2) to single Unit 102 (179.34 m2). Convenience access between Units 102 and 203, interior alterations to Unit 102 including accessible washroom. Interior accessible path of travel designed to CSA B651. 1-hr FRR/FS between Units 102 and 103.

2024-MAY-09 REVISION: Delete 2-piece bathroom, revise accessible washroom entry corridor to remove door pushbutton.

Existing Building Classification: BCBC 2006 Part 9, Group D, 2 storeys, sprinklered/fire alarm. 1-hr FRR/FS for future considerations of occupancies. 1-hr FRR for exterior walls for North, South, and West walls. 45 min required.
Application Status: COMPLETED
Permit Value: $25,000.00
Issued Date: August 16, 2023
File Close Date: July 12, 2024
Expiry Date: August 16, 2025

Associated Properties

Address Zone More
102   5190 DUBLIN WAY CD5 Property Report
203   5190 DUBLIN WAY CD5 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

FAILED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2024-07-12

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.