BP128811 - 110-6631 Island Highway (Haohan Culture Co.)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP128811 - 110-6631 Island Highway (Haohan Culture Co.)
Neighbourhood: Dover    
Street Address: 110-6631 Island Highway (Haohan Culture Co.)
Type of Application: Commercial / Multi-Res Alteration
File Number: BP128811
Date Application Submitted: October 13, 2022
Application Description: Commercial alteration of unit 110 for indoor playground. Change of use from Group E to Group A2, 922m2.
Historic equivalent approach to building code compliance required a FS with a 1HR FRR between the suite and the "altered public corridor" FS (shaft wall) with a 2HR FRR now required between suite and adjoining Group E occupancies. Maximum occupant load of 50 including staff, based on health requirements.
Building Sprinkled to NFPA 13, BCBC 2018 Governing Articles 3.2.2.24/3.2.2.64/3.2.2.55 Non Combustible construction
Adding two sinks, washrooms are unisex, one washroom to be upgraded to meet accessibility requirements

2023-FEB-23 REVISION: Structural Engineer added for over height walls, delete new wall in claw machine area, Existing washroom #1 changed to an accessible washroom, both washrooms changed to be unisex washrooms, add 2 hour F.R.R,. shaft wall system for the fire separation between proposed Group A2 and adjacent retail space Group E.
Application Status: COMPLETED
Permit Value: $300,000.00
Issued Date: November 10, 2022
File Close Date: March 22, 2023
Expiry Date: November 10, 2024

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

CANCELLED
FINAL

Final approval as per requirements on plans.

PASSED

2023-03-22

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.