Neighbourhood: | Harewood |
Street Address: | 106-601 Bruce Avenue (Sip Pub Inc) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128797 |
Date Application Submitted: | October 05, 2022 |
Application Description: |
Complete and occupy, Unit #106, (Sips Pub) Group A-2 occupancy, 162.2 m2. Scope of work includes adding partition walls, interior finishes, plumbing fixtures, NFPA 96 hood, changes to sprinkler system Existing building 924.5 m2 Group A2/E Occupancy classified as 3.2.2.27. & 3.2.2.67. of combustible construction, sprinklered with fire alarm system. June 9/23: Revision - engineered drawings received for exhaust hood, due to NFD workload, exhaust hood will only be inspected at Final June 15/23: Revision - sink/ice bin relocated, Structural Engineer revised Schedule B and drawings submitted |
Application Status: | COMPLETED |
Permit Value: | $450,000.00 |
Builder: | MCCARTAN CONTRACTING |
Issued Date: | February 24, 2023 |
File Close Date: | August 18, 2023 |
Expiry Date: | February 24, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
601 BRUCE AVENUE | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
APPROVAL-PLANNING
Approval required prior to Occupancy |
APPROVED |
APPROVAL-VIHA
Approval required prior to Occupancy |
APPROVED |
OCCUPANCY | FAILED |
OCCUPANCY |
PASSED
2023-08-18 |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.