BP128562 - 6481 Raven Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128562 - 6481 Raven Road | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6481 Raven Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP128562 |
Date Application Submitted: | June 21, 2022 |
Application Description: |
Full interior renovations with new finishes throughout and pergola constructed in backyard with outdoor kitchen 2023-FEB-17 REVISION: New trusses in dinning area. Extension of front deck. 2023-MAY-03 REVISION: Revised structural drawings showing correct beam below deck |
Application Status: | COMPLETED |
Permit Value: | $1,050,000.00 |
Building Area: |
30.66 M2 330.02 ft2 |
Builder: | PHEASANT HILL HOMES LTD |
Issued Date: | December 15, 2022 |
File Close Date: | April 10, 2024 |
Expiry Date: | December 15, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
6481 RAVEN ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-04-10 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.