BP128539 - 1936 Valley Oak Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128539 - 1936 Valley Oak Drive | |
---|---|
Neighbourhood: | University District |
Street Address: | 1936 Valley Oak Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP128539 |
Date Application Submitted: | June 21, 2022 |
Application Description: |
Truss replacement after fire damage with structural engineer. All plumbing replaced. 2023-MAR-17 REVISION: Add laundry room sink. Move Dishwasher. Move closet in master bedroom. 2023-NOV-01 REVISION: Add engineered aluminum canopy with foundations. Excavation, footings, framing, and final inspections required for canopy. |
Application Status: | COMPLETED |
Permit Value: | $100,000.00 |
Builder: | FIRST GENERAL SERVICES |
Issued Date: | September 26, 2022 |
File Close Date: | March 26, 2025 |
Expiry Date: | September 26, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
1918 JINGLE POT ROAD | R12 | Property Report |
1936 VALLEY OAK DRIVE | R12 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2025-03-26 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.