BP128498 - 3255 Stephenson Point Road (Inspace Daycare)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128498 - 3255 Stephenson Point Road (Inspace Daycare) | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3255 Stephenson Point Road (Inspace Daycare) |
Type of Application: | Leasehold Improvements |
File Number: | BP128498 |
Date Application Submitted: | May 24, 2022 |
Application Description: |
Alteration of existing building to accommodate a daycare (Inspace Daycare), work includes updating fire alarm, adding washrooms, changes to existing showers/washrooms, removing interior set of stairs new water meter and water service to be installed as per signed 'at-cost authorization form' Existing 2 storey building, 1896.5 m2, A-2 occupancy with 1 residential unit (C occupancy), unsprinklered, combustible construction Jul 27/23: Revision - adding egress stair from caretaker suite, adding notes regarding floor infill Oct 23/23: Revision - due to fire in pool area, scope of work changed, changes to required exiting and means of egress, new electrical drawings with revised exit signs & emergency lighting, revised layout for Level 1 plumbing showing correct number of washrooms |
Application Status: | COMPLETED |
Permit Value: | $300,000.00 |
Issued Date: | May 03, 2023 |
File Close Date: | November 16, 2023 |
Expiry Date: | May 03, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
3255 STEPHENSON POINT ROAD | CC6 , R5 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
CANCELLED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
APPROVED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
APPROVAL-PLANNING
Approval required prior to Occupancy |
APPROVED |
FINAL
Final Approval as per requirements on plans. |
FAILED |
FINAL
Final Approval as per requirements on plans. |
FAILED |
FINAL
Final Approval as per requirements on plans. |
PASSED
2023-11-16 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.