BP128490 - 490 Seventh Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128490 - 490 Seventh Street | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 490 Seventh Street |
Type of Application: | Locate Permit |
File Number: | BP128490 |
Date Application Submitted: | June 01, 2022 |
Application Description: |
Relocate pre-constructed SFD on new foundation. 2023-JAN-04 REVISION: Remove exterior crawl space access. Add interior access to crawl space. Add mech. room in rear of garage. Removing ext. concrete stair. Change joist directions and footing locations. 2022-OCT-04 REVISION: Add geotech. 2023-JUN-29 REVISION: Add rear deck and change concrete front landing/stairs to wood. |
Application Status: | COMPLETED |
Permit Value: | $60,000.00 |
Building Area: |
117.71 M2 1,267.02 ft2 |
Builder: | CREATIVE CONCEPTS CONSTRUCTION INC |
Issued Date: | August 18, 2022 |
File Close Date: | July 04, 2023 |
Expiry Date: | August 18, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
490 SEVENTH STREET | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
FAILED |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concete. |
PASSED |
STORM CONNECTION
Pipe connection must be visible for inspection. |
PARTIAL |
STORM CONNECTION
Pipe connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
INSULATION
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
INSULATION
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PASSED |
FINAL
Final approval as per requirements on plans |
FAILED |
FINAL
Final approval as per requirements on plans |
FAILED |
FINAL
Final approval as per requirements on plans |
PASSED
2023-07-04 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.