BP128363 - 6435 Metral Drive(Superstore)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128363 - 6435 Metral Drive(Superstore) | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 6435 Metral Drive(Superstore) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128363 |
Date Application Submitted: | April 01, 2022 |
Application Description: |
Alteration - interior renovation of southeast corner of Superstore for PC Express expansion - work includes adding walk-in cooler, changes to plumbing, adding ramp, changes to sprinkler system include adding heads in coolers Major Classification - Group E - Mercantile -3.2.2.57 (1998 code) 3.2.2.62 (2012 Code) Building Area 13139.3m2, Mezzanine - 501.86m2 , Mechanical 133.79 m2 Total area 13774.95m2, mezzanine Sprinklered, One storey, non-combustible construction, with enclosed mezzanines that are less than 10% of the floor area. 1 hour fire resistance rating for the mezzanine floor. 2 exits from the office mezzanine travel distance 45m. No rating for roof. Travel distance to exits to comply with 3.4.2.5. (2), by equivalency. Oct 19/23 - Revision: fire suppression drawing and Schedule B for installation of sprinkler heads within the coolers |
Application Status: | COMPLETED |
Permit Value: | $600,000.00 |
Issued Date: | August 19, 2022 |
File Close Date: | November 28, 2023 |
Expiry Date: | August 19, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
6435 METRAL DRIVE | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-11-28 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.