BP128254 - 2224 Lynn-La-Ran Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128254 - 2224 Lynn-La-Ran Road | |
---|---|
Neighbourhood: | Westwood |
Street Address: | 2224 Lynn-La-Ran Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP128254 |
Date Application Submitted: | February 17, 2022 |
Application Description: |
Convert existing carriage house into 'second dwelling' Second SFD on lot (BP128254) GFA is 122.49 m². DCC's charged at multi family rate for second SFD at 122.49 m² (stair exemption applies). Drainage calculated on ground floor Lot coverage of second SFD at 66.42 m². 2022-AUG-02 REVISION: New footing/post and floor joists for main bath support, upper floor walls/floor joists adjusted to fit planned renovations. |
Application Status: | COMPLETED |
Permit Value: | $150,000.00 |
Builder: | B GALLANT HOMES LTD |
Issued Date: | April 29, 2022 |
File Close Date: | April 17, 2023 |
Expiry Date: | April 29, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
2222 LYNN-LA-RAN ROAD | AR2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-04-17 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.