BP128090 - 102-335 Wesley Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP128090 - 102-335 Wesley Street
Neighbourhood: Downtown/Old City    
Street Address: 102-335 Wesley Street
Type of Application: Commercial / Multi-Res Alteration
File Number: BP128090
Date Application Submitted: December 15, 2021
Application Description: (My Hubby's Bagels) 93.4 m2, Low Occupancy A2 - renovating electrical, adding plumbing fixtures and partition walls to accommodate small bakery, no changes proposed to sprinkler system

Existing Office/Retail/Assembly/Parking Building 1,037m2, divided into a storage garage, 665m2 (separate bldg), Part 9 bldg, 439m2, E/D occ. and a Part 3 bldg, E/D/A-2, 545m2 building, 2006BCBC A-2, 3.2.2.27 by a firewall, Building Code Report by GHL March 2008. sprinklered, combustible construction, 2 storey with mezzanines on non-combustible storage garage, 45min. rated floor assembly between 1st & 2nd floor, 45min FRR for supporting structure.

Mar 11/22: Revision - sprinkler head added to walk in cooler, double sink at front counter changed to 2 single sinks.
Application Status: COMPLETED
Permit Value: $50,000.00
Issued Date: December 30, 2021
File Close Date: March 21, 2022
Expiry Date: December 30, 2023

Associated Properties

Address Zone More
335 WESLEY STREET DT2 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

PASSED

2022-03-21

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.