BP127935 - 341 Irwin Street (Caged Athletics)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127935 - 341 Irwin Street (Caged Athletics) | |
---|---|
Neighbourhood: | South End |
Street Address: | 341 Irwin Street (Caged Athletics) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP127935 |
Date Application Submitted: | November 07, 2021 |
Application Description: |
(Caged Athletics) Change of building major occupancy. from Group F2 to Group D (Low A2). New building classification; BCBC 2018 BCBC 3.2.2.63 (Group D). Single storey, combustible or non-combustible construction sprinklered to NFPA13 with fire alarm system. 562m2 building area. 2 universal washrooms. Posted maximum occupant load of 30. 568.9m2 GFA. 2023-NOV-08 REVISION: to add water entry service room and change structural EOR. |
Application Status: | COMPLETED |
Permit Value: | $200,000.00 |
Building Area: |
562.00 M2 6,049.31 ft2 |
Issued Date: | April 28, 2023 |
File Close Date: | November 24, 2023 |
Expiry Date: | April 28, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
341 IRWIN STREET | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
APPROVED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
OCCUPANCY | FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-11-24 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.