BP127934 - 3945 Biggs Road (BLDG D1) Main Permit
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127934 - 3945 Biggs Road (BLDG D1) Main Permit | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 3945 Biggs Road (BLDG D1) Main Permit |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP127934 |
Date Application Submitted: | October 22, 2021 |
Application Description: |
Main permit for Bldg D1. Building Classification: 2018 BCBC, 3.2.2.26 Group A2 occupancy, Bldg area 1440m2, 2 storey, non-combustible construction, sprinklered to NFPA-13, 2 stage fire alarm system(with strobes for workshop and music room), no FRR required for floor assemblies or mezzanine. Alternative Solution for Exit Exposure Protection (Water Curtain) GFA 1871.31m2 2024-APR-08 Revision to add record drawings to file. |
Application Status: | COMPLETED |
Permit Value: | $8,900,000.00 |
Builder: | STUART OLSON CONSTRUCTION LTD |
Issued Date: | May 30, 2022 |
File Close Date: | April 18, 2024 |
Expiry Date: | May 30, 2024 |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
APPROVED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
APPROVAL-PLANNING
Approval required prior to Occupancy |
APPROVED |
OCCUPANCY | FAILED |
OCCUPANCY | FAILED |
OCCUPANCY |
PASSED
2024-04-18 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.