BP127741 - 102-5160 Dublin Way

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP127741 - 102-5160 Dublin Way
Neighbourhood: Pleasant Valley    
Street Address: 102-5160 Dublin Way
Type of Application: Commercial / Multi-Res Alteration
File Number: BP127741
Date Application Submitted: July 29, 2021
Application Description: Change of use from Group E (retail) to Group D (dental office) occupancy, 192.0 m2. Work includes adding accessible washroom, 6 sinks, DW, W/D, partition walls and sprinkler changes

Building classified Group E 3.2.2.67. and Group D, 3.2.2.61, 2 storey, sprinklered, 3/4 hr FRR for loadbearing columns. 1hr FRR (existing) between suites, at corridor & service room separated with 1hr FRR at walls and floor, suspended slab over (parking) storage garage 2 hr FRR, 45min FRR wall assembly around elevator. Building area 859m2, 2 storeys, storage garage below considered separate building.
Bldg B - Total of 8 CRU's identified as Units #101-104 (857m2) on first floor and #201-204 (859m2) on second, 798.8m2 parking garage (below- considered separate bldg),

June5/24- Revision for sprinkler layout change in hallways from pendant to sidewall heads

Mar 13/23 - Revision: floor layout changed, shower deleted


Application Status: COMPLETED
Permit Value: $150,000.00
Builder: OMEGA CONSTRUCTION CORP
Issued Date: September 26, 2022
File Close Date: June 13, 2024
Expiry Date: September 26, 2024

Associated Properties

Address Zone More
102   5160 DUBLIN WAY CD5 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2024-06-13

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.