BP127705 - 3720 Glen Oaks Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127705 - 3720 Glen Oaks Drive | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3720 Glen Oaks Drive |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP127705 |
Date Application Submitted: | July 27, 2021 |
Application Description: |
New single family dwelling Development outside 10min response time. Sprinklered throughout to NFPA13D. 2022-JUL-20 REVISION: Change of structural engineer, revise window dimensions. 2022-NOV-18 REVISION: Add pantry sink, revise sprinkler drawings. 2022-DEC-12 REVISION: Revise sprinkler drawings. 2023-MAR-14 REVISION: Add structural engineer for interior and exterior glass guards and over-height stone veneer. |
Application Status: | HOLDBACK |
Permit Value: | $950,000.00 |
Building Area: |
270.16 M2 2,907.98 ft2 |
Builder: | DOGWOOD MOUNTAIN HOMES LTD |
Issued Date: | December 09, 2021 |
File Close Date: | May 12, 2023 |
Expiry Date: | December 09, 2023 |
Associated Properties
Address | Zone | More |
---|---|---|
3720 GLEN OAKS DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection |
CANCELLED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
SPRINKLER FINAL
Sprinkler System must be complete and operating as intended |
PASSED |
OCCUPANCY
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2023-05-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.