BP127697 - Summit Drive/Widgeon Place Properties Under Strata Plan 762
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127697 - Summit Drive/Widgeon Place Properties Under Strata Plan 762 | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | Summit Drive/Widgeon Place Properties Under Strata Plan 762 |
Type of Application: | Building Envelope Repair |
File Number: | BP127697 |
Date Application Submitted: | April 22, 2021 |
Application Description: |
Building envelope repair, replacement of cladding, windows, and doors for all buildings in VIS762. (58, 60, 68, 76 (A/C/D), 84, 92 Summit Drive; and 604 (A/B), 608 (A/B), 612 (A/B/C/D), 616, 620 Widgeon Place) existing 18 unit multi-family condominium development constructed 1978, combustible construction REVISION: 2024-MAY-13 Geotechnical & Structural design and review to add exterior stairs to 604 Widgeon Pl. REVISION: 2022-JUL-21 Geotech and new footing/ foundation wall added for deck support for Unit 68 REVISION: 2023-FEB-15 Add minor structural changes to Unit 616. Add CRP to project. REVISION: 2023-AUG-29 New footing and slab on grade for unit 616. Sept 18/23: Revision - foundation revision for Unit 616, exterior stair repair for Unit 76D, and deck repair for Units 608A/B |
Application Status: | COMPLETED |
Permit Value: | $1,300,000.00 |
Builder: | AVAGO CONTRACTING LTD |
Issued Date: | September 17, 2021 |
File Close Date: | November 14, 2024 |
Expiry Date: | June 13, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
A 76 SUMMIT DRIVE | R8 | Property Report |
D 76 SUMMIT DRIVE | R8 | Property Report |
84 SUMMIT DRIVE | R8 | Property Report |
92 SUMMIT DRIVE | R8 | Property Report |
58 SUMMIT DRIVE | R1 , R8 | Property Report |
60 SUMMIT DRIVE | R8 | Property Report |
68 SUMMIT DRIVE | R8 | Property Report |
C 76 SUMMIT DRIVE | R8 | Property Report |
620 WIDGEON PLACE | R8 | Property Report |
B 608 WIDGEON PLACE | R8 | Property Report |
A 612 WIDGEON PLACE | R8 | Property Report |
B 612 WIDGEON PLACE | R8 | Property Report |
C 612 WIDGEON PLACE | R8 | Property Report |
D 612 WIDGEON PLACE | R8 | Property Report |
616 WIDGEON PLACE | R8 | Property Report |
A 604 WIDGEON PLACE | R8 | Property Report |
B 604 WIDGEON PLACE | R8 | Property Report |
A 608 WIDGEON PLACE | R8 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
PARTIAL |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
FAILED |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
PARTIAL |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
FAILED |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
CANCELLED |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
PARTIAL |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
PARTIAL |
FOOTING / FORMS
Inspection of Forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City Stamps) must be on site |
PASSED |
FRAMING
Engineers reports must be received |
FAILED |
FRAMING
Engineers reports must be received |
CANCELLED |
FRAMING
Engineers reports must be received |
FAILED |
FRAMING
Engineers reports must be received |
CANCELLED |
FRAMING
Engineers reports must be received |
PASSED |
FRAMING
Engineers reports must be received |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-11-14 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.