BP127683 - 109-6596 Applecross Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP127683 - 109-6596 Applecross Road | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 109-6596 Applecross Road |
| Type of Application: | Leasehold Improvements |
| File Number: | BP127683 |
| Date Application Submitted: | July 09, 2021 |
| Application Description: |
Heatherbrae Builders - Tenant Improvement, Group D, 194.35 m2, two exits required. Ensure fire stopping at any penetration of the rated fire separations. The 45 min FRR/FS roof-ceiling assembly done under base building, vertical demising wall to terminate at the 45min FRR/FS roof/ceiling assembly, 2 hr FRR/FS on the demising wall installed under the base building BP112591 as part of an alternative solution. Work includes - removing non-bearing walls at two offices, and add non-bearing walls to create two offices, sprinkler modifications. "Stop Work Order" posted, double permit fees charged as per Section 30.7 of the Building Bylaw 7224. Group(s) A2, D, E 3.2.2.27. (BCBC2006) one storey,1515.24 sq m, combustible construction permitted, sprinkler/fire alarm, alternative solution(s) Jun 9/22: Revision - some office doors relocated, office partition walls shifted and reshaped |
| Application Status: | COMPLETED |
| Permit Value: | $25,000.00 |
| Builder: | HEATHERBRAE BUILDERS CO LTD |
| Issued Date: | November 18, 2021 |
| File Close Date: | June 16, 2022 |
| Expiry Date: | November 20, 2023 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6596 APPLECROSS ROAD | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL
Final Approval as per requirements on plans. |
FAILED |
|
FINAL
Final Approval as per requirements on plans. |
PASSED
2022-06-16 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)