BP127676 - 604 Nicol Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127676 - 604 Nicol Street | |
---|---|
Neighbourhood: | South End |
Street Address: | 604 Nicol Street |
Type of Application: | Single / Two Family Alteration |
File Number: | BP127676 |
Date Application Submitted: | June 29, 2021 |
Application Description: |
Install new foundation and add basement area to existing house. 2023-MAR-07 REVISION: Add extra window in bedroom, change window locations in bathroom. |
Application Status: | COMPLETED |
Permit Value: | $100,000.00 |
Building Area: |
68.84 M2 740.99 ft2 |
Builder: | MCCARTAN CONTRACTING |
Issued Date: | April 01, 2022 |
File Close Date: | July 13, 2023 |
Expiry Date: | April 01, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
604 NICOL STREET | COR1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
CANCELLED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2023-07-13 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.