BP127572 - 3232 Greystone Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127572 - 3232 Greystone Place | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 3232 Greystone Place |
Type of Application: | Garage / Carport Permit |
File Number: | BP127572 |
Date Application Submitted: | May 26, 2021 |
Application Description: |
Garage 2021-OCT-14 REVISION:Added Geotechnical and Structural engineer to pin foundation to rock. 2022-JAN-21 REVISION: Move door to south west corner, remove front windows, change roof pitch to 7/12, decrease wall height from 12 ft to 10 ft. |
Application Status: | COMPLETED |
Permit Value: | $35,000.00 |
Building Area: |
26.47 M2 284.92 ft2 |
Issued Date: | July 29, 2021 |
File Close Date: | July 10, 2023 |
Expiry Date: | July 31, 2023 |
Associated Properties
Address | Zone | More |
---|---|---|
3232 GREYSTONE PLACE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
CANCELLED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL
Final approval |
FAILED |
FINAL
Final approval |
PASSED
2023-07-10 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.