BP127571 - 2133 Bowen Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127571 - 2133 Bowen Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2133 Bowen Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP127571 |
Date Application Submitted: | May 13, 2021 |
Application Description: |
(Althouse Notary Office) Reconfigure office layout and decor upgrade. Work includes - adding main floor staff kitchen, revise & relocate accessible washroom layout and staff sink location,, change office partition wall locations, remove two exterior doors, add employee lounge to basement, changes to sprinkler system Mar 3/22: Revision - adding 1 sink to basement lounge, changing interior partition layout, existing accessible washroom to remain unchanged May 11/22: Revision - changes to sprinkler layout Existing 2 storey Part 9 office "D" building with storage "F2" in partial basement, 376.5m2 gross floor area. Sprinklered by bylaw. Construction requirements for left and right building face - 1 hour FRR with non-combustible cladding, single exit okay for each floor. 45min FRR at floors and stairwell. Occupant load 32 persons. |
Application Status: | COMPLETED |
Permit Value: | $150,000.00 |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | January 25, 2022 |
File Close Date: | June 07, 2022 |
Expiry Date: | January 25, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
2133 BOWEN ROAD | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
PASSED
2022-06-07 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.