BP127567 - 6041 Parkway Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127567 - 6041 Parkway Drive | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 6041 Parkway Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP127567 |
Date Application Submitted: | May 21, 2021 |
Application Description: |
Addition to main house and upgrading structural, upgrading interior finishes 2021-DEC-01 REVISION: Grade beam/ Pile layout for foundation, reinforced slab. 2022-JAN-27 REVISION: Bathroom and laundry layout changed, updated engineering details. 2022-FEB-09 REVISION: Additional sink in kitchen, pantry layout change, ensuite window change, mechanical room layout change, delete basement hall closet, delete living room pony wall. |
Application Status: | COMPLETED |
Permit Value: | $250,000.00 |
Building Area: |
29.65 M2 319.15 ft2 |
Builder: | CREATIVE CONCEPTS CONSTRUCTION INC |
Issued Date: | July 27, 2021 |
File Close Date: | June 17, 2022 |
Expiry Date: | July 27, 2023 |
Associated Properties
Address | Zone | More |
---|---|---|
6041 PARKWAY DRIVE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
PASSED
2022-06-17 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.