BP127149 - 411 Dunsmuir Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127149 - 411 Dunsmuir Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 411 Dunsmuir Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP127149 |
Date Application Submitted: | February 02, 2021 |
Application Description: |
(CITY SARC BLDG) - Work includes new interior partition walls for new meeting rooms and to realign offices on each floor. Mechanical adjustments to suit new layout. Sprinkler work includes relocating 2 heads and adding 2 heads on the 2nd floor. Adding 2 heads and relocating 4 heads on the third floor. Building Description, Part 3, Governing article, 3.2.2.54, Office building, Group D, Three storeys with Parking Garage, Group F3 on ~ half of the 1st storey. Building sprinklered with fire alarm. First storey, Group D = 792 m2 plus Group F3 = 788 m2; Second Storey, Group D, 1542 m2; Third Storey = 1672 m2 . Gross Floor area (Group D) = 4006 m2 plus Parking Garage (Group F3) = 788 m2. Floor assemblies and load bearing non-combustible construction as per 3.2.2.54; Exits = 45 min. FRR/FS; 1.5 hr FRR/FS between F3 and Group D. 45 metre TD. Elevator and machine room 45 min FRR/FS; Janitor room FS, Occupant load = 430 persons, |
Application Status: | COMPLETED |
Permit Value: | $660,000.00 |
Builder: | CMF CONSTRUCTION LTD |
Issued Date: | March 16, 2021 |
File Close Date: | December 22, 2021 |
Expiry Date: | March 16, 2023 |
Associated Properties
Address | Zone | More |
---|---|---|
411 DUNSMUIR STREET | DT7 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
PASSED
2021-12-22 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.