BP127142 - 106 -2517 Bowen Road(Previously Unit F)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127142 - 106 -2517 Bowen Road(Previously Unit F) | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 106 -2517 Bowen Road(Previously Unit F) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP127142 |
Date Application Submitted: | April 15, 2021 |
Application Description: |
Unit #106 (Mid-Island Co-op) - Change of Use from Group E Occupancy to Group D Occupancy,CRU GFA = 889.5m2 (by plan measurement) Work Includes installation of interior partition walls to create offices, meeting rooms and staff room. Structural engineering to fill-in exterior overhead door openings. Creating entrance vestibule. North elevation exterior wall adding new windows openings and exterior exit door c/w steel exit stair landing and stairs. Plumbing work includes relocation of 1 toilet and 1 lav,1 staff room sink, addition of 1 Sinks; 2 DW and 2 HWT, delete 1 janitors sink. Sprinkler work includes 16 new heads and relocation of 41 heads. Re-Classify Building 4263m2 BCBC 2018 - 3.2.2.61 Group D & 3.2.2.67. Group E, One-storey combustible & non-combustible construction, 45min. FRR for mezzanines and supporting structures if combustible construction, sprinklered with fire alarm system, with existing equivalency for size of enclosed (office) mezzanine for CRU - D |
Application Status: | COMPLETED |
Permit Value: | $250,000.00 |
Issued Date: | November 23, 2021 |
File Close Date: | August 15, 2024 |
Expiry Date: | November 23, 2023 |
Associated Properties
Address | Zone | More |
---|---|---|
2517 BOWEN ROAD | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-08-15 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.