BP127052 - 151 Royal Pacific Way (BLOCK 2)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP127052 - 151 Royal Pacific Way (BLOCK 2) | |
|---|---|
| Neighbourhood: | North Slope | 
| Street Address: | 151 Royal Pacific Way (BLOCK 2) | 
| Type of Application: | Commercial / Multi / Industrial | 
| File Number: | BP127052 | 
| Date Application Submitted: | December 25, 2020 | 
| Application Description: | 
                INSPECTIONS ONLY UNITS 103 & 104 5 new duplex units (10 units total) Part 9, 3 storey, sprinklered.  | 
        
| Application Status: | COMPLETED | 
| Builder: | WINDLEY CONTRACTING LTD | 
| Issued Date: | December 09, 2021 | 
| File Close Date: | November 21, 2023 | 
| Expiry Date: | December 11, 2025 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 103 151 ROYAL PACIFIC WAY | R10 | Property Report | 
| 104 151 ROYAL PACIFIC WAY | R10 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                FOOTING/FORMS
                                     Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.  | 
                            PARTIAL | 
| 
                                FOOTING/FORMS
                                     Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.  | 
                            PASSED | 
| 
                                UNDERSLAB PLUMBING
                                     complete underslab plumbing must be visible.  | 
                            PARTIAL | 
| 
                                UNDERSLAB PLUMBING
                                     complete underslab plumbing must be visible.  | 
                            PASSED | 
| 
                                UNDERSLAB INSULATION
                                     Inspection required prior to placing slab concrete.  | 
                            PASSED | 
| 
                                STORM CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PASSED | 
| 
                                SANITARY CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PASSED | 
| 
                                WATER CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping.  | 
                            PASSED | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            FAILED | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                ROUGH IN SPRINKLER
                                     Rough in sprinkler must be complete and visable for inspection.  | 
                            PARTIAL | 
| 
                                ROUGH IN SPRINKLER
                                     Rough in sprinkler must be complete and visable for inspection.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            CANCELLED | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PARTIAL | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PASSED | 
| 
                                MONITORING FIELD REVIEW
                                     A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.  | 
                            MONITORED | 
| 
                                SPRINKLER FINAL
                                     Sprinkler system must be complete and operating as intended.  | 
                            FAILED | 
| 
                                SPRINKLER FINAL
                                     Sprinkler system must be complete and operating as intended.  | 
                            FAILED | 
| 
                                SPRINKLER FINAL
                                     Sprinkler system must be complete and operating as intended.  | 
                            PASSED | 
| 
                                PLUMBING FINAL
                                     All fixtures must be in place.  | 
                            FAILED | 
| 
                                PLUMBING FINAL
                                     All fixtures must be in place.  | 
                            PASSED | 
| 
                                APPROVAL-ENGINEERING
                                     Approval required prior to Occupancy  | 
                            APPROVED | 
| 
                                APPROVAL-PLANNING
                                     Approval required prior to Occupancy  | 
                            APPROVED | 
| OCCUPANCY | CANCELLED | 
| OCCUPANCY | FAILED | 
| OCCUPANCY | CANCELLED | 
| OCCUPANCY | 
                                PASSED
                                     2023-11-21  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

 View in Google Earth (KML)