BP127005 - 103-6010 Brickyard Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP127005 - 103-6010 Brickyard Road | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 103-6010 Brickyard Road |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP127005 |
| Date Application Submitted: | December 18, 2020 |
| Application Description: |
(Brickyard Physiotherapy) Increasing floor space into corridor to 280 m2, removing partitions,creating a new treatment room, deleting a washroom, removing 1 and adding 2 sinks and the addition of a clothes washer. 2012 BCBC building classification, Group D, 3.2.2.61., two storey, 965.45 m2 with sprinkler/fire alarm, combustible construction permitted, floor assemblies 45min FRR, equivalency (sprinkler curtain @ atrium) REVISION 2021-JUL-23: Delete 1 sink, infill 1 doorway to corridor, install doorway to gym area and relocate 2 sprinkler heads. |
| Application Status: | COMPLETED |
| Permit Value: | $50,000.00 |
| Issued Date: | July 13, 2021 |
| File Close Date: | October 05, 2021 |
| Expiry Date: | July 13, 2023 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6010 BRICKYARD ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2021-10-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)