BP126745 - 501 - 1515 Dufferin Cres

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP126745 - 501 - 1515 Dufferin Cres
Neighbourhood: Townsite    
Street Address: 501 - 1515 Dufferin Cres
Type of Application: Commercial / Multi-Res Alteration
File Number: BP126745
Date Application Submitted: October 19, 2020
Application Description: Complete and occupy, Tenant improvement Group D (Medical Office), 204 m2. Install drop sprinkler heads, Plumbing 7 sinks, 2 - 2pc washrooms, 1 shower, 1 DW, 1HWT and 1 laundry facility.

(Colville Medical Center) Construction of 5 Storey, 3.2.2.62 (Group E), 3.2.2.56 (Group D) building with 5 Storey 3.2.2.80 (Group F3) parking garage. Building area 2020.5m2 Non-Combustible Construction, Sprinklered with Fire Alarm System.
Building Code Description: First storey - Retail 3.2.2.62 (superimposed). 2nd -5th storey - Office 3.2.2.56.
2 Hr. FRR/FS required for floor assemblies/exits, between 1st and 2nd storey and loadbearing supports,
1 Hr. FRR/FS required for floor assemblies, exits and loadbearing support (above 2nd storey), 1.5 hr. FRR/FS required between Storage Garage and other occupancies.
Exposed Bldg face requirements 2 hr. FRR West (Group E ),1 hr FRR South and East, 2 hr FRR for Garbage east wall face.

Application Status: COMPLETED
Permit Value: $165,000.00
Builder: R.W. (BOB) WALL LTD.
Issued Date: December 21, 2020
File Close Date: May 06, 2021
Expiry Date: December 21, 2022

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

CANCELLED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2021-05-06

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.