BP126702 - 200/250/300 - 6950 Island Hwy N
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP126702 - 200/250/300 - 6950 Island Hwy N | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 200/250/300 - 6950 Island Hwy N |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP126702 |
| Date Application Submitted: | September 02, 2020 |
| Application Description: |
Building Alteration - Return unit 300 to shell space, removal of 10 plumbing fixtures, 2 sinks, 1-2 pc washroom, 2-3 pc washrooms, add demising wall to create unit 250, move demising wall between unit 200 and new unit 250. Future permits required for tenant improvements for units 250 and 300. Sprinkler alterations. Building Classification (BCBC1998) 3.2.2.60 , Group E, 6739.9 m2, Sprinklered, fire alarm 45 minute (minimum) fire separation/fire resistance rating between suites. Demising walls to be continuous to the under side of the roof deck. REVISION: May. 11/2021- Add post to structural design. Remove a roof top unit for mechanical. Jul 21/21 - Revision: Fire Suppression Engineer changed Aug 31/21 -Revision: New sprinkler drawings & hydraulic calculations received |
| Application Status: | COMPLETED |
| Permit Value: | $700,000.00 |
| Builder: | TRENT BAILEY |
| Builder: | LRC BAILEY |
| Issued Date: | January 26, 2021 |
| File Close Date: | September 02, 2021 |
| Expiry Date: | January 26, 2023 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6950 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2021-09-02 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)