BP126681 - 101 - 3250 Island Hwy (3200 Island Hwy- Parent)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP126681 - 101 - 3250 Island Hwy (3200 Island Hwy- Parent) | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 101 - 3250 Island Hwy (3200 Island Hwy- Parent) |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP126681 |
| Date Application Submitted: | December 15, 2020 |
| Application Description: |
(Triple O's restaurant) Complete and Occupy 192m2 of A2 occupancy within existing shell building. Work includes interior partitions to create; An entry vestibule, seating area, kitchen and staff area. Plumbing work includes; 2 unisex WC', 1 universal WC, 1 staff WC ,7 sinks & 1 DW in kitchen area. Sprinkler work to include: addition of 24 heads and relocation of 3 heads. A resizing of the original design area and hydraulic calculations. Building Classification: 729 m2 Group A2 & E Occupancy, BCBC 2018 classified as 3.2.2.27 (A2) and 3.2.2.69.(E) combustible/ noncombustible construction, sprinklered with fire alarm system. 2 hr FRR/FS provided in BP126086 |
| Application Status: | COMPLETED |
| Permit Value: | $250,000.00 |
| Issued Date: | March 19, 2021 |
| File Close Date: | July 09, 2021 |
| Expiry Date: | March 20, 2023 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3200 ISLAND HIGHWAY N | CC3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
| OCCUPANCY |
PASSED
2021-07-09 |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
CANCELLED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.