BP126680 - 105 - 1885 Boxwood Road

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP126680 - 105 - 1885 Boxwood Road
Neighbourhood: Northfield    
Street Address: 105 - 1885 Boxwood Road
Type of Application: Commercial / Multi-Res Alteration
File Number: BP126680
Date Application Submitted: October 20, 2020
Application Description: "Change of use" (Unit 105) Reclassification of building to include Group D occupancy. Interior partition walls to create offices on the second floor and reception area and lunchroom on first floor.
Sprinkler work to include relocating 11 heads and adding 3 new heads. Plumbing work includes adding a sink and dishwasher in the lunch room.

Building Classification 2018 BCBC, 957.32 m2, 3.2.2.75. Group F2 up to 4 storeys & 3.22.63 Group D, up to 2 storeys, sprinklered. combustible or non-combustible construction permitted. Floors, mezzanines and loadbearing assemblies require 45 min FRR/FS. North facing exterior wall requires a 2 hr FRR.
GFA of Unit 105 253.8 total= (173.8m2 main + 80m2 upper floor)
Application Status: COMPLETED
Permit Value: $40,000.00
Issued Date: December 15, 2020
File Close Date: March 30, 2021
Expiry Date: December 15, 2022

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

FAILED
PLUMBING FINAL

All fixtures must be in place.

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2021-03-30

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.