| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP126680 |
| Date Application Submitted: | October 20, 2020 |
| Application Description: |
"Change of use" (Unit 105) Reclassification of building to include Group D occupancy. Interior partition walls to create offices on the second floor and reception area and lunchroom on first floor. Sprinkler work to include relocating 11 heads and adding 3 new heads. Plumbing work includes adding a sink and dishwasher in the lunch room. Building Classification 2018 BCBC, 957.32 m2, 3.2.2.75. Group F2 up to 4 storeys & 3.22.63 Group D, up to 2 storeys, sprinklered. combustible or non-combustible construction permitted. Floors, mezzanines and loadbearing assemblies require 45 min FRR/FS. North facing exterior wall requires a 2 hr FRR. GFA of Unit 105 253.8 total= (173.8m2 main + 80m2 upper floor) |
| Application Status: | COMPLETED |
| Permit Value: | $40,000.00 |
| Issued Date: | December 15, 2020 |
| File Close Date: | March 30, 2021 |
| Expiry Date: | December 15, 2022 |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2021-03-30 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)