BP126116 - 208 Colvilleton Trail

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP126116 - 208 Colvilleton Trail
Neighbourhood: Protection Island    
Street Address: 208 Colvilleton Trail
Type of Application: Commercial / Multi-Res Alteration
File Number: BP126116
Date Application Submitted: January 27, 2020
Application Description: (Beacon House Community Hall). Installation of 64.22 m2 aluminum covered patio structure designed and reviewed by professional engineer.

Existing 2012 BCBC building classification Group A-2 Occupancy 3.2.2.28., one storey with basement, unsprinklered, combustible construction

REVISION: Mar.9,2021- Add architect to building permit and complete renovation to an existing kitchen. Work includes removing 2 urinals; 1 lav and one toilet. Installation of a Universal WC. (1 toilet, 1 Lav)
Application Status: COMPLETED
Permit Value: $79,626.00
Builder: SUNRAY ALUMINUM
Issued Date: April 22, 2020
File Close Date: July 05, 2022
Expiry Date: April 22, 2022

Associated Properties

Address Zone More
208 COLVILLETON TRAIL PRC3 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
FINAL

Final approval as per requirements on plans.

CANCELLED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2022-07-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy