BP126116 - 208 Colvilleton Trail
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP126116 - 208 Colvilleton Trail | |
---|---|
Neighbourhood: | Protection Island |
Street Address: | 208 Colvilleton Trail |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP126116 |
Date Application Submitted: | January 27, 2020 |
Application Description: |
(Beacon House Community Hall). Installation of 64.22 m2 aluminum covered patio structure designed and reviewed by professional engineer. Existing 2012 BCBC building classification Group A-2 Occupancy 3.2.2.28., one storey with basement, unsprinklered, combustible construction REVISION: Mar.9,2021- Add architect to building permit and complete renovation to an existing kitchen. Work includes removing 2 urinals; 1 lav and one toilet. Installation of a Universal WC. (1 toilet, 1 Lav) |
Application Status: | COMPLETED |
Permit Value: | $79,626.00 |
Builder: | SUNRAY ALUMINUM |
Issued Date: | April 22, 2020 |
File Close Date: | July 05, 2022 |
Expiry Date: | April 22, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
208 COLVILLETON TRAIL | PRC3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2022-07-05 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.