BP126003 - 203 - 489 Wallace Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP126003 - 203 - 489 Wallace Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 203 - 489 Wallace Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP126003 |
Date Application Submitted: | November 27, 2019 |
Application Description: |
Combine 2 CRU's to create 1 - (unit 203), 269.6 m2, D occupancy (office use), minimum fire protection rating of closures to corridor is 45 min. Work includes adding partition walls and plumbing fixtures, 1 HWT, 1 double basin sink & 1 DW. Existing building, x reference BP114025, Group A Division 2, 1st storey & Group D on the 2nd floor. 3.2.2.25, building area by code = 786 m2, 1st storey, 584 m2, 2nd storey, Fire alarm system, Unsprinklered, Existing building 2 storeys with mezzanines, Heritage Building. No change of previous uses. A2 main floor, D upper. 1 hr FRR/FS between stories, 45 min. public corridor, 45 min FRR/FS roof. |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Builder: | GURDEV HOLDINGS LTD |
Issued Date: | March 13, 2020 |
File Close Date: | April 14, 2023 |
Expiry Date: | March 14, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
489 WALLACE STREET | DT7 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2023-04-14 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.